17/8/24

Saturday –

A crazy shift put in the past few days by this Motley Crew…. This Team absolutely knock it out the park, week in, week out and dont do half measures…. especially during Maintenance weeks!

We just wanted to post some pics to show the progress and what kinda stuff got done to your Course to keep pushing it in the right direction. Im sure its no supprise, we like a picture or two on this Status 🤣

Double Verti Cut.
Double pass Verti cut lines. Some built up Organic material moved and also some room to get sand into the profile.
Greens trimmed to clean up debris.
Fairway’s mown in front of coring operation.
Marking those Sprinklers so we dont make costly mistakes eeeekkk!
Loads of material 👌
4t of Sand per Green
Holes punched over the sand.
Now its dry 🥳
Once bone dry, the long slog of sweeping into the holes.
No holes missed ha ha
Dry sand filling the holes.
Some toys arrive 🤩
Fairway’s hollow cored.
Cores swept up.
Greens sarrel rolled x 3 to make some dimples.
Some more desirable grasses dropped into the dimples.
Sand & Seed brushed in.
Dry roll to close over and consolidate holes.
Greens & Approaches dry cut, along with a feed right behind.
Fairway’s dry roped and trimmed!
Bridge upgrade going well… Hopefully Monday all finished.

Today though…. Greens getting some Mollases, Wetter & Seaweed to keep them happy after their stressful week.

A splash behind to get it off the leaf.

Daily setup tasks completed.